Day 13 - 7 Hours Work
Following up the previous staining issue.. I've finally decided to re-sand the hull and stain again. Well, it is not so satisfying but already improved compared to the previous one..
Before Fixing |
Obvious defects can be seen at the especially at the bow side before I start fixing.. After re-sanding and staining, all major defects are covered. :)
Port |
Starboard |
Bow |
While waiting the stain to dry, I continued on the deck planking.
Same method as the hull planking is used, I scribed one side of the woods using an 8B pencil to give better details.
Deck Planking |
Top View |
The poop deck is not set yet, I just put it up for photoshooting. It's not done so because I'll still need to add light to it..
Treenails are also added using mechanical pencil, and finally a natural stain on it to provide protection.
Treenail |
Now the Bulwark.. I will need to cut the gun ports out before I can apply colour on it. I transferred the distance between gunports from the full scale plan provided, mark them on a piece of long cardboard to get better accuracy.
Bulwark's Gunports |
I drilled around 4-6 holes at both sides first, to help cutting them out.
Gunports |
- End of Day 13 -
No comments:
Post a Comment